This Stewart Milne Development was carried out on the basis of a pre-let to Acergy UK Limited, a major seabed-to-surface engineering company.
The project was secured following a competition among developers and a significant tenant fit out was subsequently added to the base build. The office building comprises two, three-storey wings, each with an atrium and connected by a central core incorporating the main entrance, and feature staircasde.
|